Field monitoring to the fattening pig farm located in Puok district, Siem Reap Province

From 26 to 28 of June 2022, BTIC Technical team had conducted the field monitoring to the fattening pig farm located in Puok district, Siem Reap Province in order to inspect and assess the performance of its biogas desulfurizing systems and its genset. In results of this, the desulfurizing systems were treated well after pre-treatment below 200 ppm and the generator were working properly but less loading comparing to its generator’s capacity. In general, with the flow rate was 20-27 m3/hr. the output power possibly had the peak load at 30 kW. Based the observation, its efficiency was approx. 18%-20%.
⚡️⚡️⚡️
Tel:                                   </div>
                                    <br>
                                <div class=

Tags: