Field mission to KFP for field inspection, monitoring of the biodigester pilot, and measuring the quality of the biogas

On October 10, 2023
The BTIC technical team conducted a field mission to KFP for field inspection, monitoring of the biodigester pilot, and measuring the quality of the biogas. and collect wastewater samples for the laboratory's analysis. As a result, the methane content was between 50 and 52%, while the H2S increased highly over 5,000 ppm before treatment, and after desulfurization, the H2S remained at 1,900 ppm, or a 50% reduction after 1 month of a full operation.
 
 

Tags: